Research Article
Baek, C. H. (2020). The effect of shortening the project duration in modular building systems. Proceedings of Spring Annusal Conference of Korea Institue of Ecological Architecture and Environment, Vol. 20, No. 1 (pp. 140-141), Seoul, Korea.
Chung, J. S., Lim, S. H., Baek, C. H., & Seol, W. J. (2018). MC design standards and practices for design standardization of domestic modular housing. Journal of the Architectural Institute of Korea Planning & Design, 34(4), 19-25.
Japan Prefabricated Construction Suppliers and Manufacturers Association (2004). Japan Prefab Housing Coordinator Training Textbook.
Kim, C. S. (2024. October 17). [Report] Modular construction in the era of carbon neutrality: Projected growth of 285 trillion won by 2030. Money S, Retrieved from https://www.moneys.co.kr/article/2024101716281014837
Korea Agency for Infrastructure Technology Advancement (KAIA) (2015). 2015 Report on the analysis of national land and transportation technology competitiveness. Korea Agency for Infrastructure Technology Advancement.
Korea Institute of Civil Engineering and Building Technology (KICT) (2019). Development of consumer customized prefabricated housing and construction of field-test. Goyang: Korea Institute of Civil Engineering and Building Technology.
Korea Institute of Civil Engineering and Building Technology (KICT) (2020). Development of PC Modular Houses Utilizing 3D Infill. Goyang: Korea Institute of Civil Engineering and Building Technology.
Korea Institute of Civil Engineering and Building Technology (KICT) (2021). Development of smart modular multi-story Hanoks. Goyang: Korea Institute of Civil Engineering and Building Technology.
Korea Institute of Civil Engineering and Building Technology (KICT) (2022). Development of modular system and establishment of supply & operational system that can respond immediately to disaster(2/3). Goyang: Korea Institute of Civil Engineering and Building Technology.
Lim, S. H. (2004). A study on the design criteria of steel unit house for the open system. Journal of The Architectural Institute of Korea Planning & Design, 20(6), 133-142.
Lim, S. H. (2021). Design and construction cases of OSC-based smart multi-story modular Hanok. Korea Construction Engineering Association Technical Report, pp. 30-37.
Lim, S. H., Chung, J. S., & Seol, W. J. (2021). A research on the 9-Marix Platform development for off-site construction. Proceedings of Autumn Annual Conference of Architectural Institute of Korea, Vol. 41, No. 2 (p. 83), Yeosu, Korea.
Lim, S. H., Chung, J. S., & Seol, W. J. (2022). A study on MC design standardization of mid-rise modular Korean-style house using GLT. Proceedings of Autumn Annual Conference of Architectural Institute of Korea, Vol. 42, No. 2 (pp. 111-112), Jeju, Korea.
Lim, S. H., Chung, J. S., Seol, W. J., & Baek, C. H. (2019). A study on application of MC design standardization standard and current status in Ga-Yang modular housing. Journal of the Architectural Institute of Korea Planning & Design, 35(5), 85-94.
Lim, S. H., Park, G. S., & Lee, G. K. (2009). A study on the standard joint material and reference plane for the standard of construction in the apartment - Joining part between gypsum board and windows -. Journal of the Korean Housing Association, 20(4), 31-38.
- Publisher :The Korean Housing Association
- Publisher(Ko) :한국주거학회
- Journal Title :Journal of the Korean Housing Association
- Journal Title(Ko) :한국주거학회논문집
- Volume : 36
- No :2
- Pages :095-106
- Received Date : 2025-02-06
- Revised Date : 2025-03-17
- Accepted Date : 2025-03-20
- DOI :https://doi.org/10.6107/JKHA.2025.36.2.095


Journal of the Korean Housing Association





