All Issue

2019 Vol.30, Issue 5
25 October 2019. pp. 1-8
Abstract
References

References

1

Choi, Y. S., Suh, B. G., & Yun, S. H. (2015). Development of BIM based estimation prototype system using building elements combination database. Journal of the Architectural Institute of Korea, 31(3), 45-52.

10.5659/JAIK_SC.2015.31.3.45
2

Kim, H. S., Choi, J. S., & Kim, I. H. (2015). A methodology of open BIM-based quantity take-off for schematic estimation of frame work in super-tall buildings. Journal of the Architectural Institute of Korea, 29(5), 31-38.

3

Kim, I. H. (2010). The history and concept of BIM. Review of Architecture and Building Science, 54(1), 16-21.

4

Kim, I. H., Um, S. G., & Choi, J. S. (2015). A basic study on an application of quantity take-off requirements for open BIM-based schematic estimation of architectural work. Korean Journal of Computational Design and Engineering, 20(2), 182-192.

10.7315/CADCAM.2015.182
5

Lee, C. H., Kim, S. A., & Chin, S. Y. (2011). An index for measuring the degree of completeness of BIM-based quantity take-off. Korea Journal of Construction Engineering and Management, 12(6), 79-92.

10.6106/KJCEM.2011.12.6.79
6

Lee, H. C., Kim, J. M., Choi, C. H., & Song, S. H. (2017). BIM-based cost estimation by integration with BIM model data and cost information. Journal of KIBIM, 7(3), 11-20.

7

Lee, J. H., & Jun, H. J. (2007). A study on the adaptability of BIM-based integrated building design process in domestic architectural design firms. Journal of the Korean Institute of Interior Design, 16(6), 19-27.

8

Monterio, A., & Martins, J. P. (2013). A survey on modeling guidelines for quantity takeoff-oriented BIM-based design. Automation in Construction, 35, 238-253.

10.1016/j.autcon.2013.05.005
9

Nederveen, G. A., & Tolman, F. P. (1992). Modeling multiple views on building. Automation in Construction, 1(3), 215-224.

10.1016/0926-5805(92)90014-B
10

Park, S. H., Park, H. J., & Koo, K. J. (2015). Schematic estimate framework of finishing works based on IFC-BIM knowledge. Journal of the Korea Academia-Industrial Cooperation Society, 16(6), 4176-4184.

10.5762/KAIS.2015.16.6.4176
11

Park, Y. J., Won, S. K., Han, C. H., & Lee, J. B. (2011). A study on 3D BIM collaborative approximate estimating model of structural work for apartment projects. Journal of the Architectural Institute of Korea, 27(6), 123-130.

12

Yoon, M. C. (2013). A BIM-based architectural model takes advantage of the estimate model process. Journal of the Architectural Institute of Korea, 29(9), 95-102.

Information
  • Publisher :The Korean Housing Association
  • Publisher(Ko) :한국주거학회
  • Journal Title :Journal of the Korean Housing Association
  • Journal Title(Ko) :한국주거학회논문집
  • Volume : 30
  • No :5
  • Pages :1-8
  • Received Date : 2018-11-29
  • Revised Date : 2018-12-24
  • Accepted Date : 2019-10-22